Backyard Grading

This was a small project to grade the backyard so the above ground pool had a firm foundation.

It took two yards, and an additional row of 4×6 treated lumber to hold the gravel that was required to cover the roots at the top of the slope.

If you have a small landscaping or grading project, contact us here for a quote.

Thanks for checking out our content! You can leave your comments here.